"Shunting" Example Sentences
1. The train shunting maneuver was executed flawlessly by the experienced conductor.
2. The traffic jam was caused by a shunting accident on the highway.
3. To prevent congestion on the tracks, the dispatcher ordered a shunting of the freight cars.
4. The locomotive's shunting process needed to be stopped due to a malfunction.
5. The railway company invested in new equipment to improve their shunting efficiency.
6. The shunting yard was filled with cargo waiting to be organized onto the right trains.
7. The shunting of the containers from the cargo ship to the truck was completed ahead of schedule.
8. The heavy-duty shunting truck was able to move the massive shipping containers with ease.
9. The shunting operation required careful coordination between the ground crew and the driver.
10. The shunting of the trucks was necessary to properly load and unload the cargo.
11. The shunting locomotive was used to reposition the empty freight cars.
12. The railway workers were trained in the safe operation of the shunting machinery.
13. The shunting crew worked tirelessly to sort the massive quantities of cargo.
14. It was imperative that the shunting order be followed precisely to avoid any accidents.
15. The shunting process required a high level of skill and expertise from the operator.
16. The shunting tracks were built to accommodate the heavy weight of the freight cars.
17. The shunting truck was equipped with hydraulics to make moving cargo easier.
18. The shunting switch was manually operated by the ground crew.
19. The railroad company implemented new safety measures to prevent shunting accidents.
20. The cargo was successfully shunted from the train to the warehouse.
21. The shunting operator communicated with the ground crew through hand signals to avoid any miscommunication.
22. The shunting equipment was inspected before each use to ensure proper functioning.
23. The train conductor used the shunting truck to move the empty cars away from the loading docks.
24. The shunting of the shipping containers required several crane operators to work in tandem.
25. The railway company was fined for not following proper safety protocols during a shunting operation.
26. The shunting process was temporarily halted due to inclement weather.
27. The shunting of the livestock was done quickly to minimize stress on the animals.
28. The railway workers wore protective equipment during shunting operations to prevent injury.
29. The ground crew used a checklist to ensure each shunting step was completed properly.
30. The shunting operation was completed without any issues thanks to the experienced crew.
Common Phases
1.
Shunting the train from one track to another;
2. The engine
shunting the railcars to the loading dock;
3. The
shunting of passengers from one bus to another;
4. The
shunting of goods from the warehouse to the truck;
5. The
shunting of pedestrians to the designated crossing;
6.
Shunting the vehicle into a parking spot;
7. The
shunting of traffic during road construction;
8. The
shunting of materials from one assembly line to another;
9. The
shunting of trucks to the loading bays;
10.
Shunting agriculture produce from the farm to the processing plant.