Borehole example sentences
- Home
- "Borehole" example sentences
Related (10): drilling, groundwater, well, extraction, casing, subsurface, aquifer, geology, pump, reservoir
"Borehole" Example Sentences
- Groundwater samples were collected from the borehole for testing.
- They drilled a borehole 300 feet deep to tap into the aquifer.
- The geologist monitored conditions in the borehole during drilling.
- Sensors were lowered into the borehole to measure the water temperature and level.
- The drilling rig created the borehole for installing the groundwater well.
- They lowered the casing pipe into the borehole before pouring concrete to seal it.
- Cameras were sent down the borehole to inspect its condition.
- Engineers logged information about the soil and rock layers encountered in the borehole.
- A down-hole pump was installed in the newly drilled borehole.
- The cement grout was poured into the annular space around the casing in the borehole.
- The borehole samples showed evidence of contamination in the groundwater.
- The borehole yielded 20 gallons of water per minute from the aquifer.
- Workers installed a surface seal around the borehole to prevent surface water infiltration.
- They obtained core samples from the borehole to study the geological formations.
- The temperature probe was lowered into the borehole on a steel cable.
- Packer devices were set at different depths in the borehole to isolate sections.
- A borehole camera captured video and images from 150 feet below the surface.
- After drilling, the borehole was developed to increase groundwater yield.
- The borehole collapsed during the drilling process, requiring extra stabilization measures.
- The miners drilled through multiple layers of rock to reach the desired depth of the borehole.
- Steel casing was installed in the borehole before pumping groundwater from the aquifer.
- Engineers grouted the annulus of the borehole to seal any cracks or holes.
- Rock cuttings were brought to the surface during drilling of the borehole.
- An explosive charge was lowered into the borehole to increase permeability of the rock formation.
- They poured concrete into the borehole to permanently plug and abandon the groundwater well.
- The borehole is used to drill for oil and natural gas deep underground.
- The driller recorded details about each new section of the borehole as it was created.
- Scientists took fluid samples from inside the borehole for laboratory analysis.
- Acoustic sensors were lowered into the borehole to listen for seismic activity.
- The borehole reached a total depth of one kilometer below the surface.
- Workers inserted PVC casing into the borehole before pulling the drill rig away.
- Airlift and bailing methods were used to develop the borehole after drilling.
- The miners encountered several abandoned boreholes from previous operations.
- Steel casing was cemented into the borehole to permanently secure it.
- They could pump water from the borehole to irrigate nearby agricultural fields.
- The borehole penetrated several aquifers at different depths.
- Radioactive tracers were injected into the borehole to study groundwater flow patterns.
- The borehole was lined with a steel well casing for structural support.
- The geothermal borehole reached a depth of two miles below the earth's surface.
- An obstruction in the borehole prevented instruments from descending to the target depth.
- Drill cuttings were sampled at regular intervals during deepening of the borehole.
- They installed a packer system into the borehole to isolate different zones.
- Slurry was pumped into the borehole to stabilize the walls during drilling.
- The borehole was plugged and abandoned after the groundwater well became contaminated.
- It took several weeks for the drill rig to reach the planned depth of the borehole.
- The pressure in the borehole increased with depth below the surface.
- A sensor package was lowered into the borehole on an armored cable.
- They monitored the inclination and azimuth of the borehole while drilling.
- The borehole penetrated multiple formations with different rock compositions.
- Geologists collected borehole data to create a comprehensive geological profile.
- Workers inserted a screen into the uncased borehole section to allow water inflow.
- Fresh drilling mud was pumped into the borehole to clear cuttings from the hole.
- The borehole was lined with casing and grouted to avoid collapse of the walls.
- Engineers conducted a geophysical log of the borehole to map subsurface features.
- An obstruction was encountered at 300 feet deep in the borehole.
- The borehole intersected several natural fractures in the bedrock.
- An underground explosion created a borehole for the tunnel construction.
- The miners blasted through solid rock to create the initial borehole.
- Fractures emanating from the borehole enabled groundwater flow into the well.
- They lowered a camera down the borehole to inspect its condition and integrity.
Common Phrases
- Borehole sampling- Collecting rock samples from a borehole to characterize subsurface materials.
- Borehole logging - Using various tools to gather data about formations penetrated by a borehole.
- Borehole camera- A downhole instrument lowered into a borehole to visually inspect and photograph the inside of the borehole.
- Borehole depth - How far below the surface a borehole extends.
- Borehole collapse -The failure of borehole walls resulting in a narrowing of the borehole diameter.
- Borehole diameters - The size of a borehole, typically measured in inches. Larger diameters allow for more instruments or casing to be installed.
- Borehole casing - A pipe installed in the walls of a borehole to prevent collapse and isolate zones.
- Borehole telemetry - Electronic systems for transmitting data from downhole tools to the surface in real time.
Recently Searched