Dredger example sentences
Related (10): dredging, excavation, sediment, waterway, hydraulic, canal, harbor, barge, suction, disposal.
"Dredger" Example Sentences
Common Phases
1. The dredger set to work along the river.
2. The crew removed silt and debris from the riverbed using the dredger's heavy machinery.
3. Several dredgers were working at once to clear the blocked channel.
4. The harbor dredger maintained the harbor's deep shipping channels.
5. The suction dredger vacuumed sand and sediment from the harbor floor.
6. The hopper dredger loaded the dredged material into its hoppers for transport and dumping elsewhere.
7. The shoreline dredger worked to clear and widen the shallows near the beach.
8. The clamshell dredger used its bucket to scoop material up from the river bottom.
9. The dredger deepened the channel to allow larger vessels to navigate the river.
10. The new dredger cost millions to build and operate each year.
11. The government-owned dredger maintained navigation safety in the waterway.
12. The dredged sand and silt is used for land reclamation and beach nourishment projects.
13. The marshy bank needed dredging to reduce flooding during heavy rains.
14. The harbor's dredging schedule ensures key navigation channels remain clear.
15. The dredger operated during low tide when it could reach the shallowest areas.
16. The dredged material loading facilities are necessary infrastructure for dredgers.
17. Urgent dredging work was needed in the estuary to restore proper water flow.
18. Dredgers require constant maintenance and repair of their heavy equipment.
19. The dredger operator monitored depths and sediment types while working.
20. Dredging permits are required before dredgers can begin projects.
21. The dredger barge floated to each worksite before starting suction dredging.
22. Dredger operators coordinate with local authorities and regulators on their work.
23. The dredger worked through the night to meet the project's tight deadline.
24. The silt from the dredger was transported by pipeline to the designated dump site.
25. Army Corps of Engineers dredgers maintain navigable waterways across the U.S.
26. Environmental concerns guide where and when dredgers can operate.
27. Public dredgers help maintain floodplains and coastal ecosystems.
28. The dredger cleaned the marina basin so boats could navigate safely.
29. Steel pontoon hoppers were used to transport the dredged material from the site.
30. Several dredgers worked cooperatively on the massive channel widening project.
31. The inlet needed dredging to restore water circulation between the bay and ocean.
32. Dredging spoil posed challenges for disposing of the excess material.
33. The dredger was tracked by GPS throughout each phase of the dredging project.
34. Maintenance dredging occurs annually at key locations to keep levels consistent.
35. The barge-mounted dredger operated in remote canals where accessibility was limited.
36. Airborne contaminants were monitored during the dredging process.
37 Trailing suction hopper dredgers remove material and store it within the vessel.
38. Flood control dredgers keep rivers and streams free from sediment buildup.
39. Geotechnical data informed the dredging contractor's design and dredger selection.
40. The dredger worked quickly to clear a navigable channel ahead of inclement weather.
41. Commercially operated dredgers rent their services to ports and harbors.
42. Dredged material may contain contaminants that require special handling.
43. Severe storms often necessitate emergency dredging to reopen vital waterways.
44. The narrow tidal creek required a dredger with precise maneuverability.
45. Dredging work faces economic, environmental and logistical challenges.
46. The shallow harbor required a small, agile dredger with a shallow draft.
47. Cuttersuctions dredgers use a rotating cuttinghead tool to loosen hard sediment.
48. New dredging technology aims to increase efficiency and decrease environmental impact.
49. The old dredger sat idle and derelict on the edge of the river it once maintained.
50. Nearby wetlands restricted when and how dredgers could operate in the basin.
51. Scheduled dredging allows businesses to plan their operations around the work.
52. A dredger was contracted to clear debris from an inundated residential neighborhood.
53. The backhoe dredger scooped material directly into dump trucks for transport.
54. Novatech Dredgers won the contract for New York's harbor maintenance dredging.
55. The dredger played a crucial role in restoring navigation after the hurricane.
56. Winter dredging relies on floating ice islands to support dredgers at work.
57. The excavator dredger cleared a path through the newly formed sandbar.
58. Government regulation guides dredgers how much material they can remove annually.
59. The shallow-draft dredger navigated through the mangrove-lined river channel.
60. The dredger operator worked long, arduous shifts to complete the project on time.