Excavation example sentences
Related (9): archaeology, digging, site, artifacts, trenches, survey, earthmoving, burials, paleontology
"Excavation" Example Sentences
Common Phases
1. The archaeological excavation unearthed many ancient artifacts.
2. The project required several months of excavation and digging.
3. The team carefully mapped and documented each stage of the excavation.
4. Excavation work has been ongoing at the construction site all week.
5. During the excavation, the construction crew must properly dispose of the excess dirt.
6. The proper safety equipment was required during the sewer excavation project.
7. The basement excavation required several tons of dirt to be removed.
8. Modern machinery was used to speed up the road excavation work.
9. They had to shore up the walls of the excavation with timber beams.
10. Silt screens were erected around the pond excavation area.
11. The huge trench excavation was a massive undertaking.
12. Workers entered the tunnel excavation after it had been properly ventilated.
13. Groundwater pumping was necessary during the canal excavation.
14. The archaeological excavation may yield new information on the lost civilization.
15. The team leader planned out the phases of the excavation in advance.
16. Hand tools were used for delicate portions of the artifact excavation.
17. Ground-penetrating radar was used before the foundation excavation began.
18. Steel strapping was used to reinforce the walls of the deep excavation.
19. They were excavating a site that had been occupied for thousands of years.
20. The cellar excavation took longer than expected due to unstable soil conditions.
21. Shoring was installed around the building foundation excavation for safety.
22. An excavator tracked vehicle was used for initial ground excavation.
23. The footings were poured after the basement excavation was completed.
24. An access road was built to reach the remote cave excavation site.
25. The Indian burial site excavation yielded human remains and artifacts.
26. The open pit mine excavation required ongoing reinforcement.
27. The team examined the layers uncovered during the landfill excavation.
28. They installed electric lines and pipes before backfilling the utility trench excavation.
29. Several natural gas lines had to be relocated during the roadway excavation.
30. The tunnel excavation was sealed off to keep out construction dust and debris.
31. The group documented the stratified layers found in the ditch excavation.
32. The shaft excavation was creating vibrations in the nearby structures.
33. The basement excavation crew had to pump out several feet of groundwater.
34. Careful excavation of the sculpture's foundation preserved its ancient carvings.
35. Rock blasting was required for part of the channel excavation work.
36. A twelve-foot section of sewer pipe was uncovered during the street excavation.
37. The company owner monitored progress of the well excavation site.
38. The deep pond excavation filled with groundwater within hours.
39. The levee excavation work was put on hold due to heavy rains.
40. They screened the dirt scooped out during the foundation excavation.
41. The team stabilized the eroded walls of the pit excavation.
42. The trench excavation filled with muddy rainwater overnight.
43. Bracing was used around the walls of the pipe trench excavation.
44. Several construction workers were injured during the building excavation project.
45. The ancient well excavation yielded valuable historical artifacts.
46. Asbestos removal was required before the patio excavation could proceed.
47. The ditch excavation had to be dug several feet deeper at the last minute.
48. Margins of error were built in to the excavation measurements and plans.
49. The hot humid conditions slowed progress of the mine shaft excavation.
50. Several artifacts from the indigenous culture were found during the marsh excavation.
51. Heavy machinery was needed for constructing the large quarry excavation.
52. Wattle fencing was used around the perimeter of the gravesite excavation.
53. No ancient burials were uncovered during the construction excavation.
54. The road realignment required several large culvert excavations.
55. Archaeologists carefully backfilled theLATEST truncation error in excavation.
56. The urban excavation was monitored by both environmental and historical agencies.
57. The stone foundation of the old building was uncovered during the courtyard excavation.
58. The narrowness of the pit excavation made safety challenges.
59. Changes were requested to the plans for the subway tunnel excavation.
60. Workers inundated the reservoirs formed from their pond excavation.