Footings example sentences
- Home
- "Footings" example sentences
Related (10): foundation, base, support, groundwork, underpinning, substructure, pedestal, plinth, cornerstone, piling
"Footings" Example Sentences
- The building's footings are strong enough to support the weight of several floors.
- The construction team dug deep to create sturdy foundations for the footings.
- Without properly installed footings, a building can become unstable and dangerous.
- The footings of the bridge needed reinforcement to withstand the heavy traffic.
- The engineer designed the footings to perfectly match the soil consistency of the site.
- The inspection revealed that the footings had shifted slightly due to ground movement.
- The contractors worked tirelessly to pour the concrete footings before the deadline.
- The construction crew encountered unexpected obstacles while digging the footings.
- The footings of the new house were carefully inspected to ensure their integrity.
- The excavation of the footings required specialized equipment and a skilled team.
- The engineers specified the depth of the footings based on the weight and size of the proposed structure.
- The footings of the ancient building remain intact despite centuries of erosion and weathering.
- The architect specified that the footings be placed in a perfect grid to ensure stability.
- The foundation and footings must be completed before the rest of the building can be built.
- The worker carefully inspected the footings for any cracks or imperfections before continuing the construction.
- The engineers needed to double-check the calculations to ensure that the footings could withstand any natural disasters.
- The builder custom-designed the footings to match the unique shape and size of the building.
- The contractor had to create a special formula for the concrete used to pour the footings due to the unique soil composition.
- The footings were the most critical part of the construction process as they determined the stability of the building.
- The construction team spent weeks carefully excavating the ground and planning the installation of the footings.
- The footings of the skyscraper needed to be anchored deep into the bedrock to ensure stability.
- The architect specified that each footing have a custom drain built into it to prevent water damage.
- The design team had to make adjustments to the building plans after it was discovered that the footings needed to be deeper than originally anticipated.
- The excavator had to work carefully around existing structures to dig the footings of the new building.
- The inspection team carefully analyzed the footings to ensure that they would meet all safety and industry standards.
- The builder hired an independent inspector to review the footings before the final concrete was poured.
- The engineers recommended installing additional steel reinforcement in the footings to provide extra strength and durability.
- The builder was able to complete the installation of all the footings in just under a week.
- The contractor recommended using a prefabricated footing system for faster and more cost-effective installation.
- The project manager was pleased with the quality and strength of the new building's footings.
Common Phrases
- The footings must be dug to a certain depth;
- The footings should be designed to withstand the weight of the structure;
- Proper reinforcement of footings is important to ensure stability;
- The location and spacing of footings must be carefully planned;
- Concrete footings should be allowed to cure for a minimum of 7 days;
- Footings should be inspected by a qualified professional before construction begins;
- It is important to backfill and compact soil properly around footings;
- Footings can be made of various materials such as concrete, masonry, or wood;
- The size of footings is determined by the load they will bear and the type of soil they are on;
- Footings can be poured in one continuous pour or in sections depending on the size of the structure.
Recently Searched