"Lugeons" Example Sentences
1. The lugeons of water trickled down the stone wall.
2. The farmer measured the depth of the well using lugeons.
3. The engineer conducted a lugeon test to determine the permeability of the ground.
4. The construction worker used a lugeon bag to inject grout into the soil.
5. The geologist studied the lugeons in the rock formation to understand its history.
6. The hydrologist used lugeons to measure the flow rate of the river.
7. The penetration tests showed high lugeon values in the soil.
8. The maintenance crew used lugeons to identify leaks in the water supply system.
9. The drilling rig was fitted with lugeon testing equipment to conduct real-time soil analysis.
10. The groundwater recharge facility measured the lugeon flow to determine the sustainability of the resource.
11. The construction team encountered high lugeon values in the rock during excavation.
12. The environmental agency used lugeon tests to assess the risk of contamination in the soil.
13. The civil engineer calculated the lugeon value to determine the pore pressure in the soil.
14. The dam's intake structure was designed with lugeon data to ensure its stability.
15. The mining company studied the lugeon values in the ore deposit to estimate its potential yield.
16. The seismologist analyzed the lugeon data to estimate the seismic hazard in the area.
17. The water conservation program uses lugeons to monitor the water balance in the ecosystem.
18. The contractor used a lugeon packer to inject cement grout into the fractured rock.
19. The irrigation system was designed with lugeon data to ensure the proper distribution of water.
20. The hydrogeologist used lugeons to analyze the aquifer's hydraulic properties.
21. The civil engineering team estimated the foundation settlement using lugeon values.
22. The geotechnical engineer conducted a lugeon test to determine the soil's stabilization parameters.
23. The oil and gas company analyzed the lugeon measurements to estimate the formation's permeability.
24. The water supply system was tested for leaks using lugeons.
25. The mine safety regulations require lugeon tests to ensure the stability of underground structures.
26. The bridge's foundation design was based on lugeon data to ensure its integrity.
27. The soil engineer measured the lugeon value to determine the soil's compaction characteristics.
28. The water treatment plant uses lugeons to monitor the clarity of the water.
29. The slope stability analysis incorporated lugeon data to estimate the risk of landslides.
30. The geophysical survey measured the lugeons to determine the depth of the bedrock.
Common Phases
1. "The rock formation has a permeability of 200
lugeons; we will need to use grouting to improve the stability of the area."
2. "The borehole yielded a water flow rate of 5
lugeons; this suggests that the aquifer is fairly productive."
3. "The dam is experiencing high seepage rates, with measurements ranging from 50 to 150
lugeons; we recommend implementing a drainage system to control the water."
4. "The soil in the area has a permeability ranging from 10 to 30
lugeons; this indicates that the site may be suitable for constructing a pond or reservoir."
5. "During the pump test, we observed an average permeability of 15
lugeons; this confirms the aquifer's ability to supply water."