Lugeons example sentences
- Home
- "Lugeons" example sentences
Related (2): Lugeons, hydrogeology.
"Lugeons" Example Sentences
- The lugeons of water trickled down the stone wall.
- The farmer measured the depth of the well using lugeons.
- The engineer conducted a lugeon test to determine the permeability of the ground.
- The construction worker used a lugeon bag to inject grout into the soil.
- The geologist studied the lugeons in the rock formation to understand its history.
- The hydrologist used lugeons to measure the flow rate of the river.
- The penetration tests showed high lugeon values in the soil.
- The maintenance crew used lugeons to identify leaks in the water supply system.
- The drilling rig was fitted with lugeon testing equipment to conduct real-time soil analysis.
- The groundwater recharge facility measured the lugeon flow to determine the sustainability of the resource.
- The construction team encountered high lugeon values in the rock during excavation.
- The environmental agency used lugeon tests to assess the risk of contamination in the soil.
- The civil engineer calculated the lugeon value to determine the pore pressure in the soil.
- The dam's intake structure was designed with lugeon data to ensure its stability.
- The mining company studied the lugeon values in the ore deposit to estimate its potential yield.
- The seismologist analyzed the lugeon data to estimate the seismic hazard in the area.
- The water conservation program uses lugeons to monitor the water balance in the ecosystem.
- The contractor used a lugeon packer to inject cement grout into the fractured rock.
- The irrigation system was designed with lugeon data to ensure the proper distribution of water.
- The hydrogeologist used lugeons to analyze the aquifer's hydraulic properties.
- The civil engineering team estimated the foundation settlement using lugeon values.
- The geotechnical engineer conducted a lugeon test to determine the soil's stabilization parameters.
- The oil and gas company analyzed the lugeon measurements to estimate the formation's permeability.
- The water supply system was tested for leaks using lugeons.
- The mine safety regulations require lugeon tests to ensure the stability of underground structures.
- The bridge's foundation design was based on lugeon data to ensure its integrity.
- The soil engineer measured the lugeon value to determine the soil's compaction characteristics.
- The water treatment plant uses lugeons to monitor the clarity of the water.
- The slope stability analysis incorporated lugeon data to estimate the risk of landslides.
- The geophysical survey measured the lugeons to determine the depth of the bedrock.
Common Phrases
- "The rock formation has a permeability of 200 lugeons; we will need to use grouting to improve the stability of the area."
- "The borehole yielded a water flow rate of 5 lugeons; this suggests that the aquifer is fairly productive."
- "The dam is experiencing high seepage rates, with measurements ranging from 50 to 150 lugeons; we recommend implementing a drainage system to control the water."
- "The soil in the area has a permeability ranging from 10 to 30 lugeons; this indicates that the site may be suitable for constructing a pond or reservoir."
- "During the pump test, we observed an average permeability of 15 lugeons; this confirms the aquifer's ability to supply water."
Recently Searched