Rails example sentences

Related (20): track, train, locomotive, switch, crossbar, sleepers, junction, platform, signal, cargo, freight, speed, gauge, tunnel, bridge, derailment, passenger, conductor, railroad, transportation

"Rails" Example Sentences

1) The train tracks were lined with steel rails.
2) The roller coaster sped along the rails with great speed.
3) The carpenter placed the rails for the staircase.
4) The skateboarder rode along the metal rails of the park bench.
5) The horse-drawn carriage clattered along the cobblestone rails.
6) The tram ran smoothly on its rails through the city streets.
7) The fence was made of wooden rails.
8) The sled glided along the icy rails of the hill.
9) The mining cart ran on rails through the tunnels of the mine.
10) The shipyard was filled with steel rails for building ships.
11) The young child held onto the rails tightly while learning to ice skate.
12) The steel rails of the bridge created a strong foundation for the structure.
13) The vintage car followed the rails of the historic train track.
14) The mountain biker navigated the rough rails of the trail with great skill.
15) The amusement park ride followed a path on rails through twists and turns.
16) The train conductor had to inspect the rails for any damage before starting the journey.
17) The balcony had metal rails for safety precautions.
18) The construction crew laid down the rails for the new subway system.
19) The old mine shaft had rusted rails that were no longer safe.
20) The boat dock had wooden rails for tying up boats.
21) The ski lift followed rails up the mountain to transport skiers.
22) The factory used conveyor belts that ran on rails to transport goods.
23) The locomotive chugged along the rails with great power and force.
24) The mountain climber navigated the rails of the steep rock face.
25) The snowboarder slid down the rails of the terrain park.
26) The train station had rails leading to various destinations.
27) The amusement park ride operators checked the rails for safety before opening the ride to the public.
28) The bicycle trail had rails to prevent bikers from falling off the edge.
29) The railway tracks had multiple rails for different directions of travel.
30) The old train station had historic wooden rails that were preserved for their significance.

Common Phases

1. Create new rails app;
2. Generate model;
3. Generate controller;
4. Add validation to model;
5. Create database schema;
6. Migrate database;
7. Add routes to controller;
8. Generate views for controller actions;
9. Add authentication;
10. Deploy to production server.

Recently Searched

  › Rails
  › Nationn
  › Selves
  › Modicuma
  › Carves
  › Hymnsalso
  › Pagmamahal
  › Conciliatory
  › Brackets
  › Snores
  › Smudgers
  › Empathised
  › Sublet
  › Diegoine
  › Ethoxyquin
  › Auditorium
  › Snickerings
  › Pragmatical
  › Smashbox
  › Smelts
  › Pragmatist

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z