Scaffoldadjective example sentences
- Home
- "Scaffoldadjective" example sentences
Related (5): construction, support, platform, framework, staging
"Scaffoldadjective" Example Sentences
- The construction workers had to use a sturdy scaffold to reach the roof of the building.
- The artist erected a scaffold to paint the ceiling mural in the church.
- The repairman climbed up the scaffold to fix the broken window on the third floor.
- The building code requires that all scaffolds be inspected regularly for safety purposes.
- The workers had to assemble the scaffold before they could begin painting the exterior of the house.
- Due to the height of the building, the construction crew had to use a specially designed scaffold that was anchored to the ground.
- The scaffold collapsed during the construction project, injuring several workers.
- The workers had to carefully dismantle the scaffold after the project was completed.
- The painting crew used the scaffold to reach the ceiling in the foyer.
- The scaffolding was an essential tool for the renovation of the historic building.
- The scaffold gave the workers a stable platform to install the new light fixtures.
- The city imposed a fine on the contractor for using an unsafe scaffold during construction.
- The workers had to take a safety course before using the scaffold on the job site.
- The scaffold was erected around the entire building during the restoration process.
- The painter had to balance on the narrow scaffold while working on the upper part of the mural.
- The scaffold had to be dismantled and moved to a different location on the construction site.
- The scaffolding equipment was rented from a company that specializes in construction tools.
- The workers had to use caution when climbing up and down the scaffold to avoid accidents.
- The scaffold was secured to the building with steel beams to ensure stability.
- The contractor hired an experienced team of workers to assemble the scaffold correctly.
- The painter brought his own brushes and paints to use while working on the scaffold.
- The scaffold was equipped with guardrails to prevent falls.
- The construction crew used a hoist to lift heavy materials up to the scaffold.
- The scaffolding was dismantled in sections as the building was completed.
- The workers had to wear hardhats while working on the scaffold for safety reasons.
- The scaffold had to be taken down after several weeks of use on the project.
- The workers used a crane to move the large scaffold into position.
- The scaffold allowed the crew to access hard-to-reach areas of the building.
- The construction company provided insurance coverage in case of accidents involving the scaffold.
- The workers had to follow strict safety protocols when working on the scaffold.
- The scaffold was removed from the job site after the project was completed.
- The painter used a roller to paint the walls while standing on the scaffold.
- The workers had to use additional support beams to stabilize the large scaffold.
- The scaffold was inspected by a safety inspector before being used on the project.
- The construction workers had to wear safety harnesses while working on the highest levels of the scaffold.
- The scaffolding was designed to withstand strong winds and harsh weather conditions.
- The workers had to use a special tool to secure the scaffold to the side of the building.
- The scaffold had to be carefully dismantled by the construction crew at the end of the project.
- The painter had to take breaks frequently due to the uncomfortable position he was in on the scaffold.
- The construction company invested in high-quality scaffolding equipment to ensure safety on the job site.
Common Phrases
- The scaffolded structure;
- The scaffolded framework;
- The scaffolded system;
- The scaffolded support;
- The scaffolded design;
- The scaffolded methodology;
- The scaffolded approach;
- The scaffolded architecture;
- The scaffolded model;
- The scaffolded plan.
Recently Searched