Theodolite example sentences

Related (15): angle, triangulation, surveying, measurement, altitude, inclination, azimuth, horizontal, vertical, elevation, topography, calibration, accuracy, instrument, geodesy

"Theodolite" Example Sentences

1. He used a theodolite to measure the height of the building.
2. A theodolite was used to calculate the angle of the slope.
3. The surveyor used a theodolite to measure the distance between two points.
4. The theodolite was used to measure the angle of the horizon.
5. The theodolite was used to determine the exact position of the object.
6. He used a theodolite to measure the altitude of the stars.
7. The theodolite was used to measure the direction of the wind.
8. The surveyor used a theodolite to measure the angle of the mountain.
9. The theodolite was used to measure the distance between two mountains.
10. He used a theodolite to calculate the exact position of the sun.
11. The theodolite was used to measure the angle of the hill.
12. The surveyor used a theodolite to measure the altitude of the mountain.
13. The theodolite was used to measure the angle of the river.
14. He used a theodolite to determine the exact position of the river.
15. The theodolite was used to measure the distance between two hills.
16. The surveyor used a theodolite to measure the angle of the lake.
17. The theodolite was used to measure the altitude of the lake.
18. He used a theodolite to calculate the exact position of the lake.
19. The theodolite was used to measure the angle of the valley.
20. The surveyor used a theodolite to measure the altitude of the valley.
21. The theodolite was used to measure the distance between two valleys.
22. He used a theodolite to determine the exact position of the valley.
23. The theodolite was used to measure the angle of the peak.
24. The surveyor used a theodolite to measure the altitude of the peak.
25. The theodolite was used to measure the distance between two peaks.
26. He used a theodolite to calculate the exact position of the peak.
27. The theodolite was used to measure the angle of the forest.
28. The surveyor used a theodolite to measure the altitude of the forest.
29. The theodolite was used to measure the distance between two forests.
30. He used a theodolite to determine the exact position of the forest.
31. The theodolite was used to measure the angle of the cliff.
32. The surveyor used a theodolite to measure the altitude of the cliff.
33. The theodolite was used to measure the distance between two cliffs.
34. He used a theodolite to calculate the exact position of the cliff.
35. The theodolite was used to measure the angle of the canyon.
36. The surveyor used a theodolite to measure the altitude of the canyon.
37. The theodolite was used to measure the distance between two canyons.
38. He used a theodolite to determine the exact position of the canyon.
39. The theodolite was used to measure the angle of the plateau.
40. The surveyor used a theodolite to measure the altitude of the plateau.

Common Phases

Taking a bearing; Setting up the instrument; Sighting a target; Calculating the angle; Measuring the distance; Leveling the theodolite; Adjusting the instrument; Recording the data; Checking accuracy.

Recently Searched

  › Theodolite
  › Sternite
  › Motet
  › Spiracle
  › Forgettable
  › Prementum
  › Metasoma
  › Clockwork
  › Charminger
  › Overcooked
  › Ata
  › Steampunk
  › Yokeln
  › Unusualness
  › Jacksfrom
  › Mitsubishi
  › Snorkels
  › Lenticularly
  › Yottabit
  › Revocable
  › Anchovy
  › Anachronism

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z