Boreholes example sentences

Related (6): groundwater, drilling, mining, exploration, petroleum, monitoring.

"Boreholes" Example Sentences

1. The team of geologists drilled several boreholes to study the rock formations.
2. The local farmer had a borehole dug to provide water for his crops.
3. The construction crew encountered unexpected complications when digging the borehole.
4. The groundwater monitoring project required the installation of numerous boreholes.
5. The engineers relied on borehole data to design a stable foundation for the building.
6. The drilling rig was used to create a deep borehole for oil exploration.
7. The borehole provided a reliable source of clean water for the remote village.
8. The environmental assessment report recommended the drilling of additional boreholes to determine the extent of contamination.
9. The abandoned borehole posed a safety hazard to nearby residents.
10. The hydrogeologist used specialized equipment to measure the water level in the borehole.
11. The borehole log revealed the thickness and composition of the different layers of soil and rock.
12. The government agency mandated regular borehole monitoring to detect any potential environmental risks.
13. The borehole was lined with steel to prevent collapse during drilling.
14. The contractor used a specialized technique to drill the borehole at an angle.
15. The borehole must be sealed properly to prevent contamination of the water supply.
16. The borehole drilling process caused disruptions to the nearby traffic and businesses.
17. The borehole pump failed for a second time, causing water shortages for local residents.
18. The borehole construction crew worked around the clock to meet the project deadline.
19. The geological survey team identified several potential sources of water through borehole exploration.
20. The mining company was granted a permit to dig boreholes to explore for new mineral deposits.
21. The borehole rehabilitation project aimed to restore old and abandoned wells for improved water supply.
22. The borehole inspection revealed major structural damage to the well.
23. The team of experts used borehole data to predict the potential risks of an earthquake.
24. The borehole construction required obtaining various permits and approvals from government agencies.
25. The borehole tapping machine was used to connect the water supply to the local irrigation system.
26. The borehole maintenance crew replaced the aging pump system with a more efficient one.
27. The borehole drilling disrupted the habitat of several endangered species of animals in the area.
28. The geothermal heating system relied on a network of boreholes to extract heat from the ground.
29. The borehole casing had to be properly installed to prevent contamination of the water by surface runoff.
30. The borehole rehabilitation program also aimed to train and educate local communities on sustainable water management practices.

Common Phases

1. The geologist drilled multiple boreholes in the area;
2. The boreholes revealed the presence of mineral deposits;
3. The workers lowered equipment into the boreholes to conduct tests;
4. A pump was installed at the bottom of the borehole to extract water;
5. The boreholes were dug to determine the soil composition;
6. The mapping of the area relied heavily on information gathered from the boreholes;
7. The construction crew used the boreholes to determine where to place foundations;
8. The environmental consultant studied the borehole samples to assess the contamination level;
9. The boreholes were abandoned after the exploration was complete;
10. The boreholes served as a crucial part of the site investigation.

Recently Searched

  › Boreholes
  › Kokyu
  › Shriekingly
  › Nested
  › Dictums
  › Chiron
  › Phylloclade
  › Assistive [əˈsistiv]
  › Kimchijjigae [ˈkimCHē]
  › Steamy
  › Jetson
  › Preterite
  › Eftsoons [feˈsto͞on]
  › Applause
  › Tamarisk
  › Maximizers
  › Decalitre

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z