Plasterboards example sentences

Related (4): drywall, wallboard, sheetrock, gyprock

"Plasterboards" Example Sentences

1. The contractor used plasterboards to cover the walls.
2. Unfortunately, the heavy rain caused the plasterboards to swell.
3. I need to buy some plasterboards for my DIY project.
4. The plasterboards in the basement needed to be replaced.
5. The soundproofing in the studio was done with plasterboards.
6. The plasterboards were cut to size and then installed.
7. He accidentally drilled through one of the plasterboards.
8. The plasterboards were painted a neutral color.
9. The builder recommended using water-resistant plasterboards in the bathroom.
10. The plasterboards were secured using screws and glue.
11. The plasterboards were delivered to the site on time.
12. The plasterboards needed to be sanded down before painting.
13. The plasterboards gave the room a smooth finish.
14. The contractor installed the plasterboards with precision.
15. The plasterboards were stacked neatly in the corner of the room.
16. The plasterboards were damaged during transit and had to be returned.
17. The plasterboards were lightweight and easy to handle.
18. The plasterboards were used to cover the insulation.
19. The plasterboards were pre-cut to fit the room.
20. A special compound was applied to the plasterboards to waterproof them.
21. The plasterboards were fixed to the walls using metal frame anchors.
22. The plasterboards were taped and jointed to hide the seams.
23. The plasterboards were screwed onto the ceiling joists.
24. The plasterboards were fire-resistant and offered added safety.
25. The plasterboards were coated with a layer of primer before painting.
26. The plasterboards were manufactured using recycled materials.
27. The plasterboards were purchased from a local hardware store.
28. Additional layers of plasterboards were added for added soundproofing.
29. The plasterboards were cut to allow for electrical outlets and switches.
30. The plasterboards were finished with a coat of high-gloss paint.

Common Phases

1. Install the plasterboards;
2. Cut the plasterboards to fit the wall;
3. Screw the plasterboards in place;
4. Apply joint compound to the seams;
5. Sand the joint compound;
6. Apply a second coat of joint compound;
7. Sand the second coat of joint compound;
8. Apply a final coat of joint compound;
9. Sand the final coat of joint compound;
10. Prime the plasterboard surface;
11. Paint the plasterboards.

Recently Searched

  › Plasterboards [ˈplastərˌbôrd]
  › Boohooing
  › Pneumatocyst
  › Complemented
  › Ellipsoids [əˈlipsoid]
  › Disturber
  › Masking
  › Apparente
  › Ascidian
  › Tefillah
  › Acidophiles
  › Sncc
  › Infamies
  › Panelist
  › Laughing
  › Pedagogics
  › Connivere
  › Doloresite
  › Oppression
  › Plonger
  › Curatorships
  › Quickbread

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z